Capital projects run on a logistics assumption.

We're the ones who check it.

Project logistics for mining, wind, nuclear and infrastructure builds. We check the routes, ports and lift constraints everyone else takes off a map – from pre-FID through final delivery, by one team.

50%

win rate on major competitive bids

WCA

member - global network, local partners

Top Growing

Canada's Top Growing Companies 2026

ONE team

study through final delivery

The Problem

Nobody's careless. Nobody's checking.

Logistics is around 8–10% of project cost. It’s also the line most likely to come from a different site.

Nothing forces the question

Logistics has no built-in trigger to get asked at study stage. So it goes to whoever’s nearest

Routes taken from a map

The main port just because it’s a main port. A rail line that shows on Google but hasn’t run in years.

By the time it surfaces, it can't be designed out

Only paid for. Modularisation and site-access options close as the design matures.

And when it fails later it affects the whole project: a provider wins the scope, misses weeks in, and the site sits exposed while someone gets called in under pressure.

Same project. Two different plans.

One of them had someone whose actual job was to check.

Defaulted

Checked

✖ The biggest port on the map

✔ The port that fits this site

✖ Estimate waits for full information

✔ Estimate starts with what exists

✖ Trade-off assumed

✔ Trade-off tested against alternatives

✖ Constructability found by the design

✔ Constructability shapes the design

✖ Plan re-guessed at handover

✔ One team, study to delivery

The Solution

One team from the first study to the last delivery.

No handover. No room for a problem to hide in.

Most clients start with us at the first study. Some call when a plan has already failed.

You need it done, we've done it.

World-class transport solutions - any time, any place, any project.

With us, you don’t just get the right logistics answer; you gain decades of hard-earned knowledge from some of the most experienced professionals in the business.

Named projects, real numbers, and what was actually at stake.

Côté Gold

15 acres, 24 hours

Laydown crisis resolved. Became an $8M contract.

Fort MacLeod

43 towers

New corridor opened. Barge and truck, purpose-built trailer.

Bay Street Bridge

400,000 lb

Multimodal move through downtown Toronto.

Ask us about the ones we can’t name yet.

Ask the people who've already bet a project on us.

Interviews with clients, not curated quotes.

The four things people ask before they hire us.

Short answers. Longer ones if you call.

Clients confuse global offices with global capability. Our heavy-lift team has more than 50 years of experience. One client chose us over going straight to the world’s largest heavy-lift company — they wanted somebody who understood the whole scope, not the one piece everyone assumes matters.

EPCMs manage procurement. Logistics strategy is a different discipline, and usually the one nobody was assigned.

A $15,000 route study on a northern BC mine became a $3.5M execution contract. Same client has brought us into three more projects since. And the study stands on its own whether or not you use us for execution.

Fair. We’ve grown through referrals rather than marketing. Here’s who we’ve worked with →

INDUSTRIES

Where the logistics is the hard part.

Mining, wind, nuclear and infrastructure – remote sites, oversized cargo, thin transport networks.

Mining

Remote sites, superloads, seasonal access

Wind

Blades, nacelles, escorted corridors

Nuclear

Engineered lifts, security, zero tolerance

Infrastructure

Urban routes, permits, live traffic

we believe in

Boots on the ground.

Our “boots on the ground” approach means we dispatch our dedicated professionals directly to your project sites. They’re there to provide hands-on oversight, ensure seamless execution, and proactively address any challenges, guaranteeing your logistics run flawlessly from start to finish. 

Send us the project and the part you're worried about.

Route, port, lift, laydown, schedule. Whatever’s keeping the number soft.

Aaron Gerber

PRINCIPAL & VICE PRESIDENT OF SALES – the person who actually reads this form.

A logistics engineer replies, usually within a week.

Let us know what you're looking for.

Give us some details about your project, and we’ll take it from there.

Or team will get back to you, usually within a week.