Project logistics for mining, wind, nuclear and infrastructure builds. We check the routes, ports and lift constraints everyone else takes off a map – from pre-FID through final delivery, by one team.
Logistics is around 8–10% of project cost. It’s also the line most likely to come from a different site.
Logistics has no built-in trigger to get asked at study stage. So it goes to whoever’s nearest
The main port just because it’s a main port. A rail line that shows on Google but hasn’t run in years.
Only paid for. Modularisation and site-access options close as the design matures.
And when it fails later it affects the whole project: a provider wins the scope, misses weeks in, and the site sits exposed while someone gets called in under pressure.
One of them had someone whose actual job was to check.
✖ The biggest port on the map
✔ The port that fits this site
✖ Estimate waits for full information
✔ Estimate starts with what exists
✖ Trade-off assumed
✔ Trade-off tested against alternatives
✖ Constructability found by the design
✔ Constructability shapes the design
✖ Plan re-guessed at handover
✔ One team, study to delivery
No handover. No room for a problem to hide in.
Most clients start with us at the first study. Some call when a plan has already failed.
Route, corridor and port assessments. Trade-off studies. Logistics estimating built for incomplete information. Constructability and risk mapping.
Usually when: a feasibility gate is approaching, or a lender wants logistics risk documented.
In-house heavy lift and specialised transport. Centralised logistics management across every mode and vendor.
Usually when: high super-load volume, a remote site, or a decentralised project that went wrong last time.
Materials management, laydown and site logistics. Schedule rescue when someone else’s plan fails.
Usually when: the OEM is shipping before site is ready, or the incumbent is missing commitments.
With us, you don’t just get the right logistics answer; you gain decades of hard-earned knowledge from some of the most experienced professionals in the business.
Named projects, real numbers, and what was actually at stake.
Laydown crisis resolved. Became an $8M contract.
New corridor opened. Barge and truck, purpose-built trailer.
Multimodal move through downtown Toronto.
Ask us about the ones we can’t name yet.
Interviews with clients, not curated quotes.
Short answers. Longer ones if you call.
Clients confuse global offices with global capability. Our heavy-lift team has more than 50 years of experience. One client chose us over going straight to the world’s largest heavy-lift company — they wanted somebody who understood the whole scope, not the one piece everyone assumes matters.
EPCMs manage procurement. Logistics strategy is a different discipline, and usually the one nobody was assigned.
A $15,000 route study on a northern BC mine became a $3.5M execution contract. Same client has brought us into three more projects since. And the study stands on its own whether or not you use us for execution.
Fair. We’ve grown through referrals rather than marketing. Here’s who we’ve worked with →
Mining, wind, nuclear and infrastructure – remote sites, oversized cargo, thin transport networks.
Remote sites, superloads, seasonal access
Blades, nacelles, escorted corridors
Engineered lifts, security, zero tolerance
Urban routes, permits, live traffic
Our “boots on the ground” approach means we dispatch our dedicated professionals directly to your project sites. They’re there to provide hands-on oversight, ensure seamless execution, and proactively address any challenges, guaranteeing your logistics run flawlessly from start to finish.
Route, port, lift, laydown, schedule. Whatever’s keeping the number soft.
PRINCIPAL & VICE PRESIDENT OF SALES – the person who actually reads this form.
A logistics engineer replies, usually within a week.
Give us some details about your project, and we’ll take it from there.
Or team will get back to you, usually within a week.